IRON FENCING AROUND SJB SCHOOL PLAYGROUND & DRIVEWAY
Project Began: Sept. 2017
Project Completed: Dec. 2017
Project Cost: $40,360.00
Installation of Metal Fence System around SJB Playground and Driveway: 101’ LF X 5’ H
CATHEDRAL PARKING LOT
Project Began: Nov. 2018
Project Completed: Dec. 2018
Project Cost: $8,432.05
Removed all rail piping from the parking lot and repaired two small areas of concrete; Installed 66 Bumper Blocks
CATHEDRAL SOUND SYSTEM
Project Began: Oct. 2018
Project Completed: Dec. 2018
Project Cost: $124,829.36
The new system includes amplifiers, a computer processor, CD player, mixers, speaker array and FCC-compliant receivers and transmitters. It is expected that this system will serve the needs of the Cathedral through 2030.
CATHEDRAL LIGHTING SYSTEM
Project Began: August 2019
Project Completed: March 2020
Project Cost: $150,163.62
Install new halogen and compact fluorescent fixtures and dimmer control system to properly interface with new LED fixtures. Both up-lights and down-lights have been replaced which will eliminate the need for frequent bulb replacement. The new dimmer system has room for expansion and allows for more flexibility permitting ease of transition for various liturgies.
CATHEDRAL EXTERIOR RESTORATION
Project Began: August 2019
Project Completed: Not yet finally completed as of 2-4-2020
Project Cost to Date: $204,082.80
The project includes extensive cleaning and renovation of all exterior surfaces. The details include: (1) cleaning, inspection, repair and sealing of brick and limestone veneers; (2) cleaning, inspection and repair of roofing systems; (3) cleaning, painting and recaulking of windows and stained glass protective coverings.
Thanks to all of our donors who helped make these wonderful projects a reality!